濟南抹面砂漿:外墻水泥砂漿的抹灰如何不空鼓開裂?
來源:http://www.sjzmx.cn 日期:2025-09-18 發布人:
抹灰空鼓、裂縫在工程中一直是一個大家比較關注但一直沒有徹底解決的老大難問題,今天就從施工工序上分享一些個措施,以供參考!
Plastering hollowing and cracks have always been a long-standing and difficult problem that people are concerned about but have not completely solved in engineering. Today, I will share some measures from the construction process for reference!
墻體基層處理:抹灰前的基層處理時抹灰質量的關鍵之一。所以要求必須將基層表面的砂漿殘渣污垢、隔離劑、油漬等清理干凈。針對不同基層配置不同砂漿,兩種材料交接處,鋪釘鋼絲網,再抹底灰。
Wall base treatment: One of the key factors affecting the quality of plastering during the base treatment before plastering. So it is required to clean up the mortar residue, dirt, isolation agent, oil stains, etc. on the surface of the base layer. For different base configurations, different mortars are used. At the junction of the two materials, steel wire mesh is laid and nailed, followed by the application of bottom plaster.
基層表面垂直度和平整偏差過大,應在抹灰前剔平,當局部抹灰厚度太大時,要求用1:3水泥砂漿分層抹平,每層厚度應在7—10毫米為宜。并應該待前一層砂漿凝固后(7—8成干,發白不宜)再涂抹后一層,以防止已抹的砂漿內部產生松動。幾層濕砂漿合在一起很容易造成收縮率過大,產生裂縫、空鼓。
The verticality and flatness deviation of the base surface are too large, and should be leveled before plastering. When the local plastering thickness is too large, it is required to use a 1:3 cement mortar layer by layer to smooth it, and the thickness of each layer should be between 7-10 millimeters. And the next layer should be applied after the previous layer of mortar has solidified (7-8% dry, not suitable for whitening) to prevent loosening inside the already applied mortar. Several layers of wet mortar combined can easily cause excessive shrinkage, resulting in cracks and hollowing.
要求表面較光滑的混凝土墻面應剔毛。抹灰前先涂刷一道水泥漿粘結層,以增強基層的砂漿粘結能力,又可將浮灰事先粘牢于墻面上,消除砂漿與基層粉塊狀隔離因素,避免裂縫,空鼓。
Concrete walls with smooth surfaces should be roughened. Before plastering, apply a layer of cement paste bonding layer to enhance the bonding ability of the base mortar. The floating ash can also be firmly adhered to the wall in advance to eliminate the isolation factor between the mortar and the base powder block, and avoid cracks and hollowing.
控制工藝流程:外墻抹灰應按以下工藝流程嚴格進行:澆水濕潤基層找規矩、貼灰餅,沖筋抹底灰找平24h后彈分格線、嵌分格條抹面層灰起分格條,修分格縫24h后開始養護。
Control the process flow: External wall plastering should be strictly carried out according to the following process flow: water the base layer to make it smooth, paste the plaster cake, flush the reinforcement, apply the bottom plaster and level it for 24 hours, then snap the dividing line, embed the dividing strip, apply the surface plaster and start the dividing strip, repair the dividing joint for 24 hours, and then start curing.
要求抹灰前墻面應澆水濕潤。磚墻面一般澆水兩遍,滲水深度大約8—10毫米。如果各層抹灰相隔時間長,抹灰的砂漿已干,也應該在底層澆水潤濕后抹上一層灰。澆水程度要與施工季節、氣候和室內、室外操作環境有直接關系。外墻抹灰,炎夏季節應盡量避免在日光曝曬下進行抹灰。
The wall should be moistened with water before plastering. Brick walls are usually watered twice, with a water infiltration depth of about 8-10 millimeters. If the interval between each layer of plastering is long and the plastering mortar has dried, a layer of plaster should also be applied after wetting the bottom layer with water. The degree of watering should be directly related to the construction season, climate, and indoor and outdoor operating environments. Exterior wall plastering should be avoided as much as possible during the hot summer season when exposed to sunlight.
分層涂抹:分遍完成,分層抹灰,5~8㎜厚,采取大工序抹灰作法,濕潤墻體,刷素漿,隨刷隨抹灰。即從建筑物檐口至勒腳先抹底灰和中層砂漿,隔日再從上至下罩面灰,這期間應加強底灰澆水養護,保持濕潤狀態,對防止空裂效果很好。
Layered application: Completed in layers, layered plastering with a thickness of 5-8 mm, using a large-scale plastering method, moistening the wall, brushing with plain slurry, and plastering as needed. From the eaves to the feet of the building, apply the bottom plaster and middle mortar first, and then cover the surface plaster from top to bottom the next day. During this period, strengthen the watering and maintenance of the bottom plaster to maintain a moist state, which is very effective in preventing air cracking.
本文由 濟南抹面砂漿 友情奉獻.更多有關的知識請點擊 http://www.sjzmx.cn/ 真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.
This article is a friendly contribution from Jinan plaster mortar For more related knowledge, please click http://www.sjzmx.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
主站蜘蛛池模板:
亚洲欧美日韩综合久久久|
一本色道久久综合亚洲精|
亚洲国产av自拍精选|
无码一区二区|
边做边爱完整版|
91情侣在线精品国产|
日日噜噜夜夜狠狠视频无码|
国产亚洲精品久久久久久无|
久久午夜伦鲁片免费无码|
最新中文字幕在线播放|
成在线人免费无码高潮喷水|
亚洲熟妇精品一区二区|
国产一区二区三区视频大全|
久久99国产精品久久99小说|
两个人免费高清视频www|
91国内视频在线观看|
亚洲a级毛片|
亚洲中久无码永久在线观看同|
久久免费看少妇高潮的|
精品日产卡一卡二卡国色天香|
精品国产一区二区三区四区色|
三年在线观看免费观看大全|
国产精品熟女孕妇一区二区|
日韩精品成人一区二区三|
97国产一区二区精品久久呦|
亚洲一区二区中文av|
国产精品无码2021在线观看|
久久www免费人成—看片|
亚洲AV无码国产精品色午夜软件|
亚洲色成人一区二区三区小说|
a级国产乱理伦片在线观看99|
精品91亚洲高清在线观看|
久久中国国产Av秘 入口|
色欲综合久久中文字幕网|
狠狠做五月深爱婷婷天天综合|
给我播放片在线观看|
性无码免费一区二区三区在线网站|
国产精品特黄特色三级视频|
亚洲嫩模喷白浆在线观看|
午夜男女很黄的视频|
中文字幕一区二区三区日韩精品|

魯公網安備