石膏線的安裝工藝以及注意事項!
來源:http://www.sjzmx.cn 日期:2019-06-06 發布人:
一、石膏線安裝工藝
I. Installation Technology of Gypsum Line
1. 清洗:安裝抹灰線前,應清理安裝現場的膩子粉和灰塵。有些難以清潔的物質可以用水輥涂上一層水,然后用鏟子清理干凈。這樣可以保證石膏線安裝更加牢固,避免石膏線在以后出現脫落的現象。
1. Cleaning: Putty powder and dust should be cleaned up before plastering line is installed. Some substances that are difficult to clean can be coated with water rollers and cleaned with shovels. This can ensure that the installation of gypsum line is more solid, and avoid the phenomenon of gypsum line falling off in the future.
2. 油漆墨線:清潔灰塵后,將墨線與墨桶一起涂在墻面上。但在墻面頂角處用一段線條用力輕輕畫出,量出墻體的長度,將決定石膏線的長度和寬度。
2. Paint ink line: After cleaning the dust, paint the ink line and ink bucket on the wall together. But the length and width of the gypsum line will be determined by measuring the length of the wall by gently drawing a line at the top corner of the wall.
3.石膏線切割:確定石膏線長度后,切割石膏線。再剪兩端,就可以把膏藥線放上去,按45度已婚女性剪兩端。
3. Gypsum wire cutting: After determining the length of the gypsum wire, cut the gypsum wire. Cut both ends, you can put the plaster line on, according to 45 degrees married women cut both ends.
4. 石膏粉治療:石膏粉和水以一定比例混合,均勻涂抹它兩邊的石膏線條,然后使石膏行充裕的下緣的位置墨,拿了幾分鐘,然后用混合石膏粉填充頭部。
4. Gypsum powder treatment: mix gypsum powder and water in a certain proportion, evenly smear the gypsum lines on both sides of it, then make the gypsum line abundant lower edge position ink, take a few minutes, and then fill the head with mixed gypsum powder.
二世。注意事項
King II. Matters needing attention
1. 基本治療。石膏線施工前應清理基層,墻面應平整,無凸凹部位。墻頂角的地方,會吹膩子兩次。這將防止石膏線脫落。
1. Basic treatment. Before the construction of gypsum line, the base should be cleaned up, the wall surface should be flat and there should be no convex and concave parts. Putty will be blown twice at the top corner of the wall. This will prevent the gypsum line from falling off.


2. 石膏線在施工中,要從正面開始,這樣才能保證石膏線的正節理部分更少,使石膏線的整體效果看起來更流暢。將不足一半的關節或需要的關節放置在未標記的區域。
2. In the construction of gypsum line, it is necessary to start from the front, so as to ensure that there are fewer normal joints of gypsum line and make the overall effect of gypsum line look smoother. Place less than half of the joints or required joints in unmarked areas.
3.由于石膏的凝結時間相對較短,所以在安裝石膏線時,需要快速粘貼和調整,并迅速補上有缺陷的部分。打石膏前一定要用水清洗邊緣。
3. Because the setting time of gypsum is relatively short, it is necessary to paste and adjust quickly when installing gypsum line, and fill the defective parts quickly. Clean the edges with water before plastering.
4. 在石膏線的接縫處,必須刮掉石膏后才能進行對接。對接時應注意花紋與紋理的匹配,高度一致。使石膏線整體呈直線,下部應采用石膏墊直,以免石膏出現斷線的問題。石膏線安裝后,應及時用清水清洗干凈,以免石膏凝固,污漬無法清洗,從而影響石膏線的整體美觀程度。
4. At the joint of the gypsum thread, the gypsum must be scraped off before the joint can be made. When docking, attention should be paid to the matching of pattern and texture, which is highly consistent. In order to make the gypsum line straight as a whole, the lower part should be upright with gypsum pad in order to avoid the problem of broken line in gypsum. After installation of gypsum line, it should be cleaned with clear water in time to avoid gypsum solidification and stain can not be cleaned, thus affecting the overall aesthetic level of gypsum line.
5. 石膏線修復過程中,將石膏線粘貼后,對石膏線接縫部位進行修復,以稀釋石膏線接縫部位。對墻面進行修復,保證石膏線出墻的部位寬度一致。
5. In the process of repairing the gypsum thread, after pasting the gypsum thread, the joint of the gypsum thread is repaired to dilute the joint of the gypsum thread. Repair the wall surface to ensure that the width of the gypsum line out of the wall is the same.
主站蜘蛛池模板:
亚洲精品97福利在线|
亚洲AV永久青草无码性色av|
性色欲网站人妻丰满中文久久不卡
|
激情综合网缴情五月天|
国产成人av在线影院无毒|
人人妻人人澡人人爽国产|
国产成人无码专区|
亚洲一区二区精品无码久久久|
免费人成在线观看网站|
亚洲欧美日韩国产精品一区|
又爽又大又黄a级毛片在线视频|
gogogo免费高清在线|
日韩欧美亚洲中字幕在线播放|
男女啪啪激烈无遮挡动态图|
亚洲综合一区无码精品|
97无码免费人妻超级碰碰碰|
中文字幕日韩一二三区|
2020国产在线拍揄自揄视频|
最新综合精品亚洲网址|
国产精品亚洲日韩AⅤ在线观看|
国产无套内射又大又猛又粗又爽|
国产欧美日韩综合一区二区三区
|
精品偷拍一区二区三区在线看|
中文字幕丰满乱孑伦无码专区|
小蜜被两老头吸奶头|
久久久久久99精品热久久|
国产一区二区丰满熟女人妻|
麻豆人人妻人人妻人人片av|
亚洲AV无码午夜嘿嘿嘿|
日本高清免费不卡视频|
成人免费AV一区二区三区|
91久久国产热精品免费|
日本中文一二区有码在线|
在线亚洲综合欧美网站首页|
国产尤物av尤物在线观看|
2022精品福利在线小视频|
亚洲无码性爱视频在线观看
|
97精品国产97久久久久久|
国产精品亚洲综合久久小说|
婷婷四虎东京热无码群交双飞视频|
18亚洲AV无码成人网站国产|

魯公網安備