抹面砂漿施工后需要養護嗎?
來源:http://www.sjzmx.cn 日期:2023-04-04 發布人:
抹面砂漿在施工后需要馬上保養,保養需要留意施工時的溫度,在依據溫度的狀況確認保養時需要準備的材料,此外也是有無需保養的產品,具體保養條件如下所示:
The plastering mortar needs to be maintained immediately after construction, and attention should be paid to the temperature during construction. The materials that need to be prepared for maintenance should be confirmed based on the temperature condition. In addition, there are products that do not require maintenance, and the specific maintenance conditions are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規定:
When the average daily temperature during winter construction is less than 5 ° C, it should be carried out in winter and meet the following requirements:
1.濟南抹面砂漿施工前要采取一定的有效措施加熱基礎表層,使其溫度維持在KTC以上,并清理存水。
Before the construction of Jinan plastering mortar, certain effective measures should be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up any water.
2.受冷前,水泥基工程材料的抗壓程度不可小于6MPa。
Before being cooled, the compressive strength of cement-based engineering materials should not be less than 6MPa.
高溫氣候環境施工施工位置溫度超過37°C,應按高溫氣候延緩施工并滿足以下規定:
If the temperature of the construction site in a high-temperature climate exceeds 37 ° C, the construction should be postponed according to the high-temperature climate and meet the following requirements:


1.施工前24小時采取一定的有效措施,避免施工位置受到遭受直射或別的輻射熱。
1. Take effective measures 24 hours before construction to avoid direct sunlight or other radiation heat at the construction site.
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎和設備底板的溫度不可超過37°C。
2. Take appropriate temperature reduction measures, and the temperature of the concrete foundation and equipment bottom plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過35°C。
3. The injection temperature of the slurry should not exceed 35 ° C.
4.施工后應及時采取補濕保養措施。
4. Moisturizing and maintenance measures should be taken promptly after construction.
免保養條件如下所示:
The maintenance free conditions are as follows:
施工溫度超過5°小于37°時,基礎施工后無需保養。超過溫度范圍應遵循抹面砂漿施工保養方法實行保養。
When the construction temperature exceeds 5 ° C but is less than 37 ° C, there is no need for maintenance after the foundation construction. If the temperature exceeds the range, the maintenance method for plastering mortar construction should be followed for maintenance.
冬天保養需要準備的材料:棉被、薄膜這些材料主要是為了保溫,因為冬天溫度過低,因此需要做好保溫防范準備
Materials that need to be prepared for winter maintenance: cotton quilts, thin films, etc. These materials are mainly used for insulation. Due to the low temperature in winter, it is necessary to prepare for insulation prevention
夏天保養需要準備的材料:薄膜,薄膜主要是為了補濕,預防水分的太早外流造成產品施工內部無法牢固,此外一定要按時灑水,灑水的也是為了補濕,因為在施工后內部反應需要大量水分。您有需求就來我們網站http://www.sjzmx.cn咨詢吧!
Materials that need to be prepared for summer maintenance: thin films. Thin films are mainly used to replenish moisture and prevent the early outflow of water from causing the internal construction of the product to become unstable. In addition, it is necessary to sprinkle water on time, as it is also used to replenish moisture, as a large amount of water is required for internal reactions after construction. Come to our website if you have any needs http://www.sjzmx.cn Consult!
主站蜘蛛池模板:
久久狠狠一本精品综合网|
久久男人av资源网站|
日韩a一级欧美一级|
啊灬啊别停灬用力深视频
|
久久亚洲国产中v天仙www|
日日噜噜噜夜夜爽爽狠狠视频|
中文字幕人妻偷伦在线视频
|
www.成色av久久成人|
亚洲欧洲自拍拍偷综合|
精品国产中文一级毛片在线看|
欧美韩国精品另类综合|
尹人香蕉久久99天天拍久女久
|
色伊人国产高清在线|
白嫩少妇喷水正在播放|
中文字幕一精品亚洲无线一区
|
最新亚洲人AV日韩一区二区|
亚洲性视频网站|
48久久国产精品性色aⅴ人妻|
久久久久国产精品免费免费搜索|
国产亚洲一区二区手机在线观看|
欧美高清精品一区二区|
亚洲另类丝袜综合网|
巨大黑人极品videos精品|
久久亚洲国产午夜精品理论片|
精品三级久久久久电影我网|
丝袜无码一区二区三区|
人人妻人人爽人人澡欧美一区|
日本午夜三级|
四虎永久精品免费视频|
精品亚洲男人一区二区三区|
日韩极品视频在线观看|
国产日韩欧美在线观看不卡|
成人免费一区二区三区视频|
亚洲精品综合五月久久小说
|
色又黄又爽18禁免费网站现观看
|
亚洲精品日本久久一区二区三区|
国产在线一区二区香蕉 在线|
天堂亚洲国产中文在线|
人人妻人人澡人人爽|
欧美日韩在线第一页|
最新系列国产专区|亚洲国产|

魯公網安備