• <nobr id="us0k0"></nobr>
    <pre id="us0k0"></pre>
    <big id="us0k0"></big>

    • 野花影院手机免费观看,日韩精品 在线 国产 丝袜,精品久久久无码中文字幕,最新免费视频一区二区三区 ,自偷自拍亚洲综合精品第一页 ,久久黄色小视频,久久精品国产亚洲一级二级,精品人妻伦一二三区久久aaa片
      歡迎您瀏覽濟南巨野河福華建材廠,主營:濟南膩子粉,濟南石膏粉,濟南抹面砂漿等建筑裝飾材料,大量批發(fā),歡迎咨詢。

      專注綠色建筑裝飾材料

      經(jīng)營管理理念:讓客戶用的放心!

      24小時服務熱線:

      13864111871

      當前位置: 首頁 - 新聞動態(tài) > 公司新聞
      公司新聞
      聯(lián)系我們

      濟南福華建材廠

      聯(lián)系人:吳老師 

      電話: 

      手機:13864111871
                0531-81901300
      地址:山東省濟南市高新開發(fā)區(qū)巨野河辦事處山圈村西


      濟南石膏粉成型的標準是什么?

      來源:http://www.sjzmx.cn 日期:2025-07-23 發(fā)布人:

        濟南石膏粉憑借其優(yōu)良的凝結(jié)性能和可塑性,在建筑、模具、藝術(shù)創(chuàng)作等領(lǐng)域應用廣泛。石膏粉的成型時間(即從加水攪拌到凝固硬化能承受一定外力的過程)是影響施工效率與成品質(zhì)量的關(guān)鍵參數(shù),其時長受多種因素影響,了解這些因素及常規(guī)成型規(guī)律,能更好地把控施工節(jié)奏。

        Jinan gypsum powder is widely used in fields such as architecture, molds, and artistic creation due to its excellent coagulation performance and plasticity. The molding time of gypsum powder (i.e. the process from mixing with water to solidification and hardening, which can withstand certain external forces) is a key parameter that affects construction efficiency and product quality. Its duration is influenced by various factors, and understanding these factors and conventional molding rules can better control the construction rhythm.

        石膏粉的基本成型過程遵循化學凝結(jié)原理,其主要成分為二水硫酸鈣,與水混合后發(fā)生水化反應,生成半水硫酸鈣晶體,晶體相互交織形成網(wǎng)狀結(jié)構(gòu),逐漸失去流動性并硬化成型。這一過程可分為初凝和終凝兩個階段:初凝是指石膏漿體失去可塑性的開始時間,此時用手指輕觸漿體表面,會留下痕跡但漿體不再流動;終凝則是漿體完全硬化,達到一定強度,用指甲劃刻表面僅能留下輕微痕跡。濟南石膏粉的初凝時間通常在幾分鐘到十幾分鐘,終凝時間多在半小時到兩小時之間,具體時長因產(chǎn)品型號與應用場景差異而有所不同。

        The basic forming process of gypsum powder follows the principle of chemical coagulation, and its main component is calcium sulfate dihydrate. After mixing with water, it undergoes a hydration reaction to generate calcium sulfate hemihydrate crystals. The crystals interweave with each other to form a network structure, gradually losing fluidity and hardening into shape. This process can be divided into two stages: initial setting and final setting. Initial setting refers to the time when the gypsum slurry loses its plasticity. At this time, touching the surface of the slurry with your fingers will leave traces but the slurry will no longer flow; Final setting refers to the complete hardening of the slurry, reaching a certain strength, and leaving only slight marks on the surface when scratched with nails. The initial setting time of Jinan gypsum powder is usually between a few minutes to a dozen minutes, and the final setting time is mostly between half an hour and two hours. The specific duration varies depending on the product model and application scenario.

        原材料特性是決定成型時間的基礎(chǔ)因素。不同純度的石膏粉成型速度差異明顯,高純度石膏粉(二水硫酸鈣含量 95% 以上)雜質(zhì)少,水化反應充分且均勻,初凝和終凝時間相對穩(wěn)定,適合對精度要求高的模具制作;含雜質(zhì)較多的石膏粉(如含黏土、石英砂等)會延緩水化反應,成型時間延長,且硬化后強度較低,多用于基層找平、填充等對強度要求不高的場景。石膏粉的細度也會影響成型速度,細度高(粉末顆粒細)的石膏粉與水接觸面積大,水化反應速度快,成型時間短,適合需要快速凝固的緊急修補作業(yè);細度低的石膏粉反應速度較慢,成型時間延長,便于大面積施工時調(diào)整造型。

        The characteristics of raw materials are the fundamental factors determining the molding time. There is a significant difference in the molding speed of gypsum powder with different purities. High purity gypsum powder (with calcium sulfate dihydrate content of over 95%) has fewer impurities, sufficient and uniform hydration reaction, relatively stable initial and final setting time, and is suitable for mold making with high precision requirements; Gypsum powder with high impurities (such as clay, quartz sand, etc.) can delay the hydration reaction, prolong the forming time, and have lower strength after hardening. It is mostly used in scenarios where the strength requirements are not high, such as base leveling and filling. The fineness of gypsum powder also affects the molding speed. Gypsum powder with high fineness (fine powder particles) has a large contact area with water, fast hydration reaction speed, and short molding time, making it suitable for emergency repair operations that require rapid solidification; Gypsum powder with low fineness has a slower reaction rate and longer molding time, making it easier to adjust the shape during large-scale construction.

      石膏粉

        水灰比(水與石膏粉的質(zhì)量比)對成型時間有顯著影響。水灰比過小(水量不足)時,石膏漿體黏稠度高,水化反應因水分不足而不完全,雖然初凝時間縮短,但終凝后內(nèi)部易產(chǎn)生孔隙,強度降低;水灰比過大(水量過多)時,漿體流動性好,水化反應速度減慢,初凝和終凝時間都會延長,多余水分蒸發(fā)后會在石膏內(nèi)部留下較多孔洞,導致成品疏松易碎。濟南石膏粉的常規(guī)水灰比在 0.4-0.6 之間,在此范圍內(nèi),成型時間較為適中,且成品強度能達到理想狀態(tài),具體比例需根據(jù)施工需求調(diào)整 —— 用于模具制作時,水灰比可略低(0.4-0.5),以縮短成型時間并提高硬度;用于藝術(shù)雕塑時,水灰比可稍高(0.5-0.6),便于長時間塑形操作。

        The water cement ratio (the mass ratio of water to gypsum powder) has a significant impact on the molding time. When the water cement ratio is too small (insufficient water), the viscosity of gypsum slurry is high, and the hydration reaction is incomplete due to insufficient water. Although the initial setting time is shortened, pores are easily generated inside after final setting, and the strength is reduced; When the water cement ratio is too high (too much water), the fluidity of the slurry is good, the hydration reaction rate slows down, and the initial and final setting times are prolonged. Excess water evaporates and leaves many pores inside the gypsum, resulting in loose and fragile finished products. The conventional water cement ratio of Jinan gypsum powder is between 0.4-0.6. Within this range, the molding time is relatively moderate, and the finished product strength can reach the ideal state. The specific ratio needs to be adjusted according to construction requirements - when used for mold making, the water cement ratio can be slightly lower (0.4-0.5) to shorten the molding time and improve hardness; When used for artistic sculpture, the water cement ratio can be slightly higher (0.5-0.6), which facilitates long-term shaping operations.

        環(huán)境溫度是影響成型時間的重要外部因素。在常溫環(huán)境(20-25℃)下,濟南石膏粉的水化反應速度適中,初凝約 10-15 分鐘,終凝約 40-60 分鐘,這也是多數(shù)施工場景的理想溫度區(qū)間。溫度升高時,分子運動加快,水化反應加速,成型時間縮短,例如在 30-40℃環(huán)境中,終凝時間可縮短至半小時以內(nèi),但溫度過高(超過 50℃)會導致水分蒸發(fā)過快,漿體表面過早干燥,內(nèi)部反應不完全,出現(xiàn)開裂現(xiàn)象。低溫環(huán)境(低于 10℃)則會延緩水化反應,成型時間顯著延長,5℃以下時,終凝時間可能超過 3 小時,且硬化后強度偏低,此時需采取保溫措施(如覆蓋保溫膜、使用溫水攪拌)加快反應速度。

        The ambient temperature is an important external factor that affects the molding time. At room temperature (20-25 ℃), the hydration reaction rate of Jinan gypsum powder is moderate, with an initial setting time of about 10-15 minutes and a final setting time of about 40-60 minutes, which is also the ideal temperature range for most construction scenarios. When the temperature rises, molecular motion accelerates, hydration reaction accelerates, and molding time shortens. For example, in an environment of 30-40 ℃, the final setting time can be shortened to less than half an hour. However, excessive temperature (over 50 ℃) can cause rapid evaporation of water, premature drying of the slurry surface, incomplete internal reaction, and cracking. Low temperature environment (below 10 ℃) will delay the hydration reaction and significantly prolong the molding time. When the temperature is below 5 ℃, the final setting time may exceed 3 hours, and the strength after hardening is low. At this time, insulation measures (such as covering insulation film and stirring with warm water) need to be taken to accelerate the reaction rate.

        添加劑的使用是調(diào)整成型時間的常用手段。為滿足不同施工需求,可通過添加化學物質(zhì)改變石膏粉的凝結(jié)速度,促凝劑(如硫酸鉀、氯化鈉)能加速晶體生成,縮短成型時間,添加量為石膏粉質(zhì)量的 0.5%-2% 時,終凝時間可縮短 30%-50%,適合需要快速固定的場景(如管道支架固定)。緩凝劑(如檸檬酸、亞硫酸鹽紙漿廢液)則通過抑制晶體生長延緩反應,添加適量緩凝劑后,終凝時間可延長至 3-4 小時,便于大型構(gòu)件澆筑或復雜造型制作時從容操作。需注意的是,添加劑的用量需嚴格控制,過量添加可能導致硬化后強度下降或出現(xiàn)返潮現(xiàn)象。

        The use of additives is a common means of adjusting the molding time. To meet different construction needs, the setting speed of gypsum powder can be changed by adding chemical substances. Accelerators (such as potassium sulfate and sodium chloride) can accelerate crystal formation and shorten molding time. When the amount added is 0.5% -2% of the mass of gypsum powder, the final setting time can be shortened by 30% -50%, which is suitable for scenarios that require quick fixation (such as pipeline support fixation). Retarders (such as citric acid and sulfite pulp waste liquid) can slow down the reaction by inhibiting crystal growth. After adding an appropriate amount of retarder, the final setting time can be extended to 3-4 hours, making it easy to operate smoothly during the pouring of large components or the production of complex shapes. It should be noted that the dosage of additives should be strictly controlled, as excessive addition may lead to a decrease in strength or the occurrence of moisture regain after hardening.

        本文由濟南石膏粉友情奉獻.更多有關(guān)的知識請點擊:http://www.sjzmx.cn真誠的態(tài)度.為您提供為全面的服務.更多有關(guān)的知識我們將會陸續(xù)向大家奉獻.敬請期待.

        This article is a friendly contribution from Jinan gypsum powder For more information, please click: http://www.sjzmx.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

      ??? 主站蜘蛛池模板: 少妇熟女久久综合网色欲| 亚洲 日本 欧洲 欧美 视频| 亚洲AV无码一区二区三区在线播放 | 亚洲一区二区三区中文字幕在线| 久久久久青草大香线综合精品| 无码专区视频精品老司机| 国产一级av一区二区在线| 亚洲精品一区二区动漫 | 国产亚洲一区二区三区成人| 精品亚洲国产成人av| 综合成人亚洲偷自拍色| 视频一区视频二区在线视频| 亚洲爆乳大丰满无码专区| 亚洲精品色午夜无码专区日韩| 国产成人午夜福利高清在线观看| 综合久久国产九一剧情麻豆| 无码中文字幕精品推荐| 亚洲综合网一区中文字幕| 五月激激激综合网色播| 国产色老妇在线精品| 国产成人8x视频一区二区| 国产三级视频网站| 一二三四电影在线观看免费| 国产精品被窝福利一区| 福利一区二区三区视频在线| 白浆出来无码视频在线| 国产精品久久久久久久伊一 | 久久久久久无码日韩欧美| 久久无码喷吹高潮播放不卡| av无码天堂一区二区三区| 蜜臀av亚洲一区二区| 宅男噜噜噜66网永久在线观看| 日本高清视频www| 高清欧美性猛交XXXX黑人猛交| 成人又黄又爽又色的视频 | 国产一级老熟女自拍视频| 在线播放免费观看av| 成人精品区| 亚洲精品一区二区区别| 日韩性网站| 人人做人人爽国产视|